Rural Energy for America Program
Renewable Energy Systems and Energy Efficiency Improvements
Questions and Answers
5.31.23
Contents
Funding ............................................................................................................................................................ 3
How will an applicant determine which source of funding they should apply for? ........................................................... 3
What criteria are used to determine the maximum grant funding percentage? ............................................................... 3
Do anaerobic digesters and biogas projects qualify for the 50 percent federal grant share? .......................................... 3
Do projects with net zero or less than zero GHGE qualify for the 50 percent federal grant share? ................................ 4
What is meant by “at the project level”? ........................................................................................................................... 4
Is there a maximum grant request amount? .................................................................................................................... 4
Is there a limit on the number of REAP grant applications that can compete in a fiscal year? ........................................ 4
How is energy community defined? ................................................................................................................................. 4
What are the REAP grant application deadlines and how do applications compete? ..................................................... 5
What are the application deadlines for a combined grant and guaranteed loan request? ............................................... 5
Can a project receive grant funding from both REAP and NRCS EQIP? ........................................................................ 5
Can a project take advantage of both the REAP grant and the Federal 30 percent Investment Tax Credit? ................. 5
If awarded is the REAP grant considered taxable income? ............................................................................................. 5
Applicant Eligibility ......................................................................................................................................... 6
Is a new business with no historical energy consumption eligible for REAP? ................................................................. 6
Are rural electric cooperatives eligible for REAP? ........................................................................................................... 6
Are rural housing cooperatives eligible for REAP? .......................................................................................................... 6
Are munis (municipally-owned utilities) eligible for REAP? .............................................................................................. 6
Are all REAP applicants required to be small businesses and how is small business defined? ..................................... 6
Are 501C3 non-profits eligible for REAP? ........................................................................................................................ 7
Are hemp farms eligible? .................................................................................................................................................. 7
Are marijuana grow operations when legal within the state eligible for REAP? .............................................................. 7
Are affiliated entities considered one applicant? .............................................................................................................. 7
Project Eligibility ............................................................................................................................................. 7
Can an application be submitted to install the same type of renewable energy system at multiple business locations
located in multiple states and if so, where should the application be filed? ..................................................................... 7
Are stand alone battery storage projects eligible? ........................................................................................................... 8
Rural Energy for America Program
USDA is an equal opportunity provider, employer and lender.
Page 2
Are Electric Vehicle (EV) charging stations eligible under REAP? .................................................................................. 8
Are commercially available distributed (smaller scale, behind the meter) wind turbines eligible under REAP? ............. 8
Are solar tractors or other electrified vehicles eligible under REAP? ............................................................................... 8
What does “eligible rural area” mean? Can corporate headquarters be located in a big city as long as the project site
is located in a rural area? ................................................................................................................................................. 8
What is an energy efficiency improvement? .................................................................................................................... 8
Would the installation of new energy efficient equipment inside a newly buillt building with no historical energy use be
eligible under REAP? ....................................................................................................................................................... 9
How does the Agency define renewable energy, are green hydrogen systems using water and solar eligible? ............ 9
Are air source (air to air) heat pumps eligible under REAP? ........................................................................................... 9
Is historical energy consumption required for a renewable energy systems project? ..................................................... 9
Are home based businesses eligible under REAP? ......................................................................................................... 9
Are apartment complexes, multi-family residential living units, rental houses, or farm labor housing, eligible for REAP?
........................................................................................................................................................................................ 10
Please explain how applications are viewed when a renewable energy system will be installed at a location with a
shared residential meter (e.g. a farmstead with one meter to power both the house and ag production operation)? .. 10
Are lease to own or capitalized leases eligible? ............................................................................................................. 10
What is required for site control? .................................................................................................................................... 10
When can an applicant incur costs or start construction of a REAP project? ................................................................ 10
Use of Funds .................................................................................................................................................. 11
Is the purchase of land eligible under REAP? ................................................................................................................ 11
What types of fees can be considered as eligible project costs? ................................................................................... 11
What happens if final total project costs differ from the intial costs proposed in the grant application? ........................ 11
Can REAP fund the cost of roofs upon which solar systems will be installed? ............................................................. 11
Does the Build America, Buy America Act (BABAA) apply to REAP grants for system installations? .......................... 12
Do Davis Bacon wage rates apply to REAP? ................................................................................................................ 12
Application Requirements ............................................................................................................................ 12
Is a feasibility study required for all renewable energy system projects? ...................................................................... 12
Is registration in the System for Award Management (SAM) required for all REAP applicants at application
submission? .................................................................................................................................................................... 12
Are all EEI projects required to have an energy assessment or audit regardless of the cost of the project? ................ 13
What is the applicant required to submit at time of application to satisfy the environmental review requirements? ..... 13
Where can I find REAP application requirements? ........................................................................................................ 13
Scoring ........................................................................................................................................................... 13
How do I know if my project is located in a disadvantaged or distressed community in order to receive points? ......... 13
Will projects that “reduce” GHGE get a portion of the 5 environmental benefits points available for projects that do not
produce greenhouse gases at the project level? ........................................................................................................... 13
Rural Energy for America Program
USDA is an equal opportunity provider, employer and lender.
Page 3
Is there a limit to the amount of renewable energy a system can produce in relation to the current amount of energy
used? .............................................................................................................................................................................. 14
Is there any priority given to completely off-grid systems? ............................................................................................ 14
What is the underutilized renewable energy technology set-aside? .............................................................................. 14
How is underutilized renewable energy technology defined? ........................................................................................ 14
Are applications prioritized by application date? ............................................................................................................ 14
Does the scoring criteria still include points for applicants that have not received a previous REAP award? ............... 15
Is there a minimum score? ............................................................................................................................................. 15
Can we estimate the amount of energy that a renewable energy system will replace? ................................................ 15
Funding
How will an applicant determine which source of funding they should apply for?
An applicant will not need to worry about which source of funding to apply for. Applications which
are only eligible for grants of 25 percent or less will automatically be funded using mandatory Farm
Bill dollars until the funds are exhausted. Applications requesting grants above 25 percent up to the
maximum of 50 percent will be funded using IRA funds.
What criteria are used to determine the maximum grant funding percentage?
Applications submitted on or after April 1, 2023 with projects that meet one of the following are
eligible for a Federal grant share of up to 50 percent:
o
Renewable energy systems or retrofits that produce zero greenhouse gas emissions
at the project level;
o
Projects located in an Energy Community defined in 26 U.S.C. 45 (b)(11)(B);
o
Energy efficiency improvement projects;
o
Projects proposed by eligible Tribal entities.
All other projects are limited to a Federal grant share of up to 25 percent.
Do anaerobic digesters and biogas projects qualify for the 50 percent federal grant
share?
Rural Energy for America Program
USDA is an equal opportunity provider, employer and lender.
Page 4
An anaerobic digester or biogas project would be eligible for the 50 percent federal grant share if
the project will be located within an energy community as defined by the IRA or if the application is
submitted by a Tribal entity.
Do projects with net zero or less than zero GHGE qualify for the 50 percent federal
grant share?
Only if the project will be located in an energy community as defined by the IRA or if the application
is submitted by a Tribal entity. Reduction, capture, or off-setting GHGE is not the same as a project
which does not generate emissions in the first place.
What is meant by “at the project level”?
It means that the Agency only views the direct emissions of the project at the project site and does
not consider other emissions that may occur outside of the project site.
Is there a maximum grant request amount?
Yes, the maximum grant request size is $500,000 for energy efficiency improvements and $1 million
for renewable energy systems. There is no maximum total project size. The applicant determines
what percent of grant funds to apply for up to the máximum Federal grant shares and grant request
amounts.
Is there a limit on the number of REAP grant applications that can compete in a fiscal
year?
Yes, an applicant can compete only one RES and one EEI grant application in a fiscal year. The
maximum grant assistance to one applicant cannot exceed $1,500,000, which equals one maximum
funded RES and one maximum funded EEI project. The maximum grant award applies to all
affiliated entities as if they applied as one applicant. For example, if three special purpose entities
were formed to each operate a solar PV project and all entities are owned and controlled by the
same parent company, the maximum RES award in a fiscal year for the parent company and all
special purposes entities cannot exceed $1 million.
How is energy community defined?
Energy Community is defined in 26 U.S.C. 45 (b)(11)(B), and as determined by the Department of
Energy.
P
age 5
What are the REAP grant application deadlines and how do applications compete?
In response to stakeholder feedback the Agency added more frequent grant competitions. Six
quarterly application windows are open and complete applications compete by score in the following
quarter. Q1 is April 1, 2023 through June 30, 2023; Q2 is July 1, 2023 through September 30, 2023;
Q3 is October 1, 2023 through December 31, 2023; Q4 is January 2, 2024 through March 31, 2024;
Q5 is April 1, 2024 through June 30, 2024; Q6 is July 1, 2024 through September 30, 2024.
Grant requests of $20,000 or less will automatically compete in a set-aside for small grants when
aplicable. Applications first compete for the state allocation of funds followed by national office
pooling competitions. Applications not funded will automatically compete in the next available
competition but must be withdrawn if not funded by September 30 of each year.
What are the application deadlines for a combined grant and guaranteed loan
request?
There have been no changes to the process of making application for a combined grant and
guaranteed loan. All grant and loan documents must be submitted simultanously and applications
are accepted yearround. The combined request competes for funding as a grant in the competitions
outlined in the notice. If the grant is awarded, the requested guaranteed loan funds will be reserved
for the project.
Can a project receive grant funding from both REAP and NRCS EQIP?
A project funded utilizing REAP Inflation Reduction Act (IRA) funds cannot exceed a federal grant
share of more than 50 percent. Therefore if you have the same project, the federal REAP and
EQUIP grant funding together could not exceed 50 percent. REAP projects funded utilizing
mandatory funds are limited to 25 percent federal grant funding.
Can a project take advantage of both the REAP grant and the Federal 30 percent
Investment Tax Credit?
Yes. A tax credit is not a grant but rather a credit that is applied to taxable income after the system
has been installed. There is no conflict if a project takes advantage of both incentives. Applicants
are advised to seek counsel from a tax advisor regarding eligibility and applicability of tax credits.
If awarded is the REAP grant considered taxable income?
Yes it is taxable income and awardees will receive a Form 1099-G from the Agency.
Rural Energy for America Program
USDA is an equal opportunity provider, employer and lender.
Rural Energy for America Program
USDA is an equal opportunity provider, employer and lender.
Page 6
Applicant Eligibility
Is a new business with no historical energy consumption eligible for REAP?
For energy efficiency improvement applications energy savings based on the last 12-60 consecutive
months of utility bills are required. A renewable energy system application is scored as either a
replacement of energy or as energy generation. Therefore, a new business entity would be eligible
to install a renewable energy system that is scored as a generation project.
Are rural electric cooperatives eligible for REAP?
The cooperative would be eligible if it meets the SBA size standards.
Are rural housing cooperatives eligible for REAP?
The cooperative would be eligible if it meets the SBA size standards. Given REAP’s residential
restrictions the improvements that are being considered cannot benefit residential living quarters.
Please contact your state energy coordinator to ensure project eligibility.
Are munis (municipally-owned utilities) eligible for REAP?
Small business is defined in 7 CFR 4280.103 and in part: (iii) An electric utility (including a Tribal or
governmental electric utility) that provides service to rural consumers and operates independent of
direct government control. The entity must also meet the SBA size standard. The Agency will need
to look at how the municipally-owned utility is structured and governed to ensure the entity operates
independent of government control. Many operate with majority control from a government entity
and therefore would not be eligible.
Are all REAP applicants required to be small businesses and how is small business
defined?
An applicant must meet the definition of either an agricultural producer or a rural small business as
found in 7 CFR 4280.103. This small business definition is derived from the Small Business
Administration (SBA) and uses the table of size standards in accordance with 13 CFR part 121 or
the alternative size standard. Small business determinations are made using the size of applicant
entity alone and the size of the entity combined with other entity(ies) it controls or entity(ies) it is
controlled by.
Rural Energy for America Program
USDA is an equal opportunity provider, employer and lender.
Page 7
Are 501C3 non-profits eligible for REAP?
No, in general non-profit entities are not eligible. The REAP statute allows a few exceptions which
include: cooperatives, an electric utility, a tribal business entity, or an agricultural producer. These
entities are still required meet the definition of small business in 7 CFR 4280.103.
Are hemp farms eligible?
Projects proposing to produce, procure, supply or market any component of the hemp plant or hemp
related by-products, require the applicant entity to have an approved license with the state, and the
state must have an approved plan with the USDA per 2018 Farm Bill requirements. Verification of
valid hemp licenses will occur prior to award. Eligibility of hemp related projects is determined on a
case by case basis depending on how the hemp will be used. Applications that utilize the hemp for
nutritional or medicinal purposes including CBD are not eligible for REAP.
Are marijuana grow operations when legal within the state eligible for REAP?
Marijuana grow operations are not eligible for REAP as they are not legal on a Federal level.
Are affiliated entities considered one applicant?
The maximum grant award applies to all affiliated entities as if they applied as one applicant.
Maximum grant assistance to an applicant in the fiscal year is $1,500,000.
Project Eligibility
Can an application be submitted to install the same type of renewable energy system
at multiple business locations located in multiple states and if so, where should the
application be filed?
Each location would need to be owned by the exact same legal entity. If the technology to be
installed at each location is the same, for example installing solar PV at each location, filing a single
application is eligible. If solar will be installed at one location and wind installed at another location,
the applicant would need to choose which application to file to compete with a fiscal year. An
applicant can only compete one renewable energy system application and one energy efficiency
application in a fiscal year. Applications are filed to the state where the project is located and in
Rural Energy for America Program
USDA is an equal opportunity provider, employer and lender.
Page 8
cases where multiple states are involved, the applicant must choose one state in which to file the
application. Please note that each site will require a seperate environmental review.
Are stand alone battery storage projects eligible?
A project to purchase and install a stand alone battery is not eligible under REAP. If the applicant
entity owns a renewable energy system and would like to retrofit the system with a battery, this
would be eligible as a renewable energy system retrofit. New renewable energy systems with
storage components are also eligible.
Are Electric Vehicle (EV) charging stations eligible under REAP?
A stand alone electric vehichle charging station is not eligible under REAP. A charging station that is
part of a renewable energy system, such as a solar powered EV charge station, would be eligible as
long as the energy will not be dispensed for retail use, e.g. self-use by applicant entity only.
Are commercially available distributed (smaller scale, behind the meter) wind turbines
eligible under REAP?
Yes. REAP funds only commercially available technology and can fund a wide range of project
sizes and proposed uses of renewable energy.
Are solar tractors or other electrified vehicles eligible under REAP?
Vehicles of any type (including boats), agricultural tillage equipment and used equipment, are not
eligible under REAP.
What does “eligible rural area” mean? Can corporate headquarters be located in a big
city as long as the project site is located in a rural area?
Rural Area is defined in 7 CFR 4280.103. Please visit the rural area eligibility mapping tool to
determine if the proposed project is located in an eligible rural area. Applicant entity headquarters
can be located in a non-rural area as long as the project site is located in an eligible rural area.
Agricultural producer applicants may locate projects in non-rural areas as long as the project is
related to agricultural production on the project site.
What is an energy efficiency improvement?
Rural Energy for America Program
USDA is an equal opportunity provider, employer and lender.
Page 9
An energy efficiency improvement is defined as improvements to or replacement of an existing
building or systems or equipment, owned by the applicant, that reduces energy consumption on an
annual basis. An energy audit or energy assessment is required which shows energy savings
(kwh/btu) as a result of the proposed improvements. Examples include but are not limited to lighting,
refrigeration, heating, ventilation and cooling, automated controls, and insulation.
Would the installation of new energy efficient equipment inside a newly buillt building
with no historical energy use be eligible under REAP?
No. The REAP grant program is not intended to fund the installation of new energy efficient
equipment in a new building. See definition of energy efficiency improvement above. Agricultural
producers however may use guaranteed loan funds only to install new energy efficient equipment
(EEE) and systems used for agricultural production and processing. Please visit our guaranteed
loan page to learn more about this EEE guaranteed loan program.
How does the Agency define renewable energy, are green hydrogen systems using
water and solar eligible?
It is defined as energy derived from: 1) wind, solar, renewable biomass, ocean, geothermal or
hydroelectric source, or hydrogen derived from renewable biomass or water using an energy source
described in paragraph 1. A green hydrogen system using water and solar would be eligible.
Are air source (air to air) heat pumps eligible under REAP?
Yes, they are eligible as an energy efficiency improvement project as long as they show energy
savings per an energy audit. They are not eligible renewable energy systems becuase they do not
derive energy from a renewable energy source as defined above.
Is historical energy consumption required for a renewable energy systems project?
No. A renewable energy system may be installed for new energy generation. For example to install
a new geothermal system to heat and cool a newly constructed building. The project scores as
energy generation versus energy replacement.
Are home based businesses eligible under REAP?
Rural Energy for America Program
USDA is an equal opportunity provider, employer and lender.
Page 10
No. The statute does not allow for residential benefit under REAP. It is not feasible to accurately
measure electrical load contributions of in-home businesses and therefore they are not eligible for
REAP.
Are apartment complexes, multi-family residential living units, rental houses, farm
labor housing, or owner-occupied B&Bs/airbnbs/VRBOs eligible for REAP?
No, owners of these types of facilities are not able to utilize REAP for these operations because
they are considered residential, meaning someone lives on the property for other than a short term
stay. In addition an eligible REAP applicant cannot remote net meter or credit energy to these types
of residential businesses.
Please explain how applications are viewed when a renewable energy system will be
installed at a location with a shared residential meter (e.g. a farmstead with one meter
to power both the house and ag production operation)?
For RES projects that involve a shared meter with a residence, the project is only eligible if at least
50 percent of the projected renewable energy to be generated will benefit the business operation.
The calculation is made using total historical energy consumption documented via utility bills,
removing residential energy use documented via home energy use calculation, and the projected
amount of renewable energy to be generated. The total project cost and grant amount is prorated to
the percent benefiting the business. Alternatively, a new meter may be installed to ensure the new
renewable energy generation will only benefit the business operation. Note, this provision does not
apply to energy efficiency improvement applications given the energy audit identifes with supporting
calculations the historical energy consumption of business based efficiency improvements.
Are lease to own or capitalized leases eligible?
No. The REAP applicant must fully own and operate the REAP project and a lease of this nature
would encumber such ownership.
What is required for site control?
REAP applicants must have control of the project site for the useful life of the project. If the
applicant does not own the site and non-severable equipment or improvements are being proposed,
a long term lease between the REAP applicant and the site owner will be required.
When can an applicant incur costs or start construction of a REAP project?
Rural Energy for America Program
USDA is an equal opportunity provider, employer and lender.
Page 11
Incurring costs prior to award announcement is at the applicant’s own risk. REAP requires the
submission of a complete application and only post application costs are eligible under the program.
Please note that submission of an application does not automatically equate to having a complete
application on file, please contact your State Energy Coordinator for confirmation of a complete
application. Futhermore, all projects require an environmental review and construction activities may
jeopardize successful completion of this review. Applicants should not begin construction activities
until the Agency has advised that the environmental review is complete.
Use of Funds
Is the purchase of land eligible under REAP?
With restrictions, land is an eligible use of funds under the REAP guaranteed loan program. The
purchase of land is not an eligible use of funds under the REAP grant program.
What types of fees can be considered as eligible project costs?
An interconnection fee, a licensing or relicensing fee, or a permit fee directly related to the project
that is incurred after the complete application date would be considered as an eligible fee. Eligible
project costs are inccurred after the date a complete application has been filed and therefore energy
audit, engineering or feasibility study fees are not eligible.
What happens if final total project costs differ from the intial costs proposed in the
grant application?
The grant amount is based on total project costs filed at the time of application and cannot be
increased if costs increase. If costs are reduced the grant amount may be reduced accordingly to
ensure compliance with statutory funding requirements.
Can REAP fund the cost of roofs upon which solar systems will be installed?
Eligible project costs must be directly related to and used for installation of a renewable energy
system or energy efficiency improvement. Costs that would be incurred regardless of the RES or
EEI installation are not eligible. Therefore if an existing roof requires improvements to structurally
support the solar panels the costs could be included. However, if building an entirely new building
upon which solar will be installed, the cost of the roof should not be included as it would have been
incurred regardless of the installation of solar. The purchase and installation of a carport used as
Rural Energy for America Program
USDA is an equal opportunity provider, employer and lender.
Page 12
an elevated support structure for an agrivoltiatic or solar EV charging station project would be
eligible.
Does the Build America, Buy America Act (BABAA) apply to REAP grants for system
installations?
BABAA applies only when: 1) the project is for a non-Federal entity, defined as: a State, local
government, Indian tribe, Institution of Higher Education (IHE), or nonprofit organization that carries
out a Federal award as a recipient or subrecipient; 2) the project is for infrastructure; and 3) the
project involves construction.
Do Davis Bacon wage rates apply to REAP?
No.
Application Requirements
Is a feasibility study required for all renewable energy system projects?
A feasibility study is not required for all renewable energy system projects and the requirement is no
longer tied to the total project cost, but rather, to the risk of the project. For example most solar PV
installations are low risk and do not require a feasibility study whereas a biomass waste to energy
project with complex considerations, may warrant a feasibility study. Please visit with your State
Energy Coordinator about the proposed project to determine the need for a feasibility study. The
applicant is responsible for the cost of the feasibility study if required.
Is registration in the System for Award Management (SAM) required for all REAP
applicants at application submission?
The applicant entity must be successfully registered in the SAM and provide a Unique Entity
Identification (UEI) Number to the Agency at time of application. The UEI replaces the CAGE code
which is no longer required. Start the SAM registration process as soon as possible. If unsuccessful
and the applicant provides the Agency with documentation of attempts to complete the SAM
registration and obtain the UEI prior to the application deadline, the Agency may accept the
application. Under no circumstances will funds be disbursed without active SAM registration and a
UEI.
Rural Energy for America Program
USDA is an equal opportunity provider, employer and lender.
Page 13
Are all EEI projects required to have an energy assessment or audit regardless of the
cost of the project?
Yes, to be eligible an energy efficiency improvement project must show energy savings based on
actual historical energy consumption as outlined in an energy audit or energy assessment.
What is the applicant required to submit at time of application to satisfy the
environmental review requirements?
The level of environmental review will vary depending on the proposed project activities and
location. Please contact your State Energy Coordinator to discuss the NEPA process as it relates to
your proposed project as soon as posible. At a mínimum, a complete REAP application must
contain sufficient environmental information as outlined on the environmental checklist. A completed
NEPA review is not required at the time of application.
Where can I find REAP application requirements?
Please visit the TO APPLY tab
of the REAP website for links to the program regulation and updated
application forms. Please direct questions to your state energy coordinator.
Scoring
How do I know if my project is located in a disadvantaged or distressed community in
order to receive points?
To determine if your project is located in a Disadvantaged Community or a Distressed community,
please use the following USDA look-up map:
https://ruraldevelopment.maps.arcgis.com/apps/webappviewer/index.html?id=4acf083be4c44bb786
4d90f97de0c788. Instructions appear on the righthand side of the map and a legend and layer list
are located in the upper righthand corner of the map.
Will projects that reduceGHGE get a portion of the 5 environmental benefits points
available for projects that do not produce greenhouse gases at the project level?
No
, partial points will not be applied. To get the 5 points the project must not produce greenhouse
gases at the project level.
Rural Energy for America Program
USDA is an equal opportunity provider, employer and lender.
Page 14
Is there a limit to the amount of renewable energy a system can produce in relation to
the current amount of energy used?
There is no limit for project eligibility, however projects proposing to replace one-hundred fifty
percent or greater of their existing energy consumption are scored as energy generation projects
versus energy replacement.
Is there any priority given to completely off-grid systems?
Off-grid systems are eligible for the program but there is no priority given.
What is the underutilized renewable energy technology set-aside?
It is a set-aside pool of funds used to award applications where the proposed technology meets the
annual definition of underutilized renewable energy technology. A technology that does not meet the
definition may still be eligible for REAP, but the application would not compete in this additional set-
aside pool of funds.
How is underutilized renewable energy technology defined?
Underutilized renewable energy technology is defined as renewable energy technologies which
make up less than 20 percent of the total grant dollars obligated at the end of the fiscal year, two
years previous to the current year. No single technology may receive more than 50 percent of the
total funding available in each fiscal year, excepting years in which all underutilized technology
applications have been processed, and applications remain unfunded with funding still available in
the set-aside. For example, FY 2021 award data will be utilized to determine which technologies are
underutilized for the FY 2023 competitions. The Agency will post underutilized technology
information on the REAP website each year. No action is required by the applicant as the Agency
will automatically consider eligible projects for this set-aside.
Are applications prioritized by application date?
Complete applications are considered for funding in the next available funding competition.
Applications compete for funds on thier total project score. The application date does not prioritize
the project, though applications submitted earlier within the fiscal year will have more opportunities
to compete for funds. Applications unfunded in a quarter will automatically compete in the next
available funding competition. Any application that remains unfunded at the end of the fiscal year
(September 30) must be withdrawn.
Rural Energy for America Program
USDA is an equal opportunity provider, employer and lender.
Page 15
Does the scoring criteria still include points for applicants that have not received a
previous REAP award?
Yes, applicants that have never received a previous REAP grant or guaranteed loan will be
awarded 15 points. Applicants that received an award more than two fiscal years ago will receive 5
points. If an award was received within the last two previous fiscal years, 0 points will be awarded.
Is there a minimum score?
There is no minimum score at this time for REAP RES/EEI projects.
Can we estimate the amount of energy that a renewable energy system will replace?
No renewable energy system projects can only be scored as replacement if the applicant entity has
actual historical energy consumption for the most recent twelve to sixty months, estimates (including
projected future energy consumption) are not allowed. Renewable energy projects that cannot be
scored as replacement will be scored as energy generation projects.